Control Room Alarm Floods

We review two alarm management studies, from an LNG plant in East Kalimantan to a survey of process plants, and read them through LOPA.

By 9 min read

Distillation columns, process towers and a heater unit at the Balikpapan refinery behind a green wire fence, with a no-photography sign for the refinery area on the right, under a cloudy sky
Photo: Annidafattiya / Wikimedia Commons, CC BY 4.0
Contents
  1. Two Studies Reviewed
  2. Numbers from the Field
  3. Reading the Numbers
  4. Alarms in LOPA
  5. Limits of the Evidence
  6. The Indonesian Rules
  7. Rationalising the Alarms
  8. Where Nusa Safety Fits

In the last 11 minutes before the explosion at the Texaco refinery in Milford Haven, Wales, on 24 July 1994, two control room operators had to recognise, acknowledge and act on 275 alarms. The explosion injured 26 people and caused around £48 million of damage, and the investigators found that there were too many alarms and that they were poorly prioritised (Health and Safety Executive [HSE], 2000). Three decades on, the guidance keeps moving: IEC 62682 Edition 2.0 was published in December 2022 (International Electrotechnical Commission [IEC], 2022), and EEMUA 191 Edition 4 followed in November 2024 (Engineering Equipment and Materials Users Association [EEMUA], 2024).

The yardsticks themselves are simple. For process plants with a central control room, the target is an average of about 1 alarm per 10 minutes per operator console, no more than 10 alarms in any 10-minute period, and less than 1% of the time spent in an alarm flood, meaning more than 10 alarms in 10 minutes (IChemE Safety Centre, 2021). This article reviews two studies that show how far real plants sit from those numbers, one international overview and one implementation report from Indonesia, and then reads them through Layer of Protection Analysis (LOPA).

Two Studies Reviewed

The first is the overview by Wang et al. (2016) in IEEE Transactions on Automation Science and Engineering. It brings together published industrial surveys and then examines alarm data from one 300 MW generating unit in China, referred to as Plant A. The unit's distributed control system (DCS) monitored 24,079 process variables, of which 158 analogue and 1,784 digital variables were configured with alarms (Wang et al., 2016).

The second is a report by Nugraha (2019) in Jurnal Otomasi Kontrol dan Instrumentasi, published by Institut Teknologi Bandung, on the roll-out of an alarm management system at an LNG plant in Bontang, East Kalimantan. A 2012 audit found alarm floods in parts of the plant, and from 2013 the site introduced alarm management in stages, using ANSI/ISA-18.2 and EEMUA 191 as references. The method followed the alarm management lifecycle: write an alarm philosophy, identify the most frequent alarms (bad actors), rationalise each tag, then monitor the results (Nugraha, 2019).

Numbers from the Field

The surveys gathered by Wang et al. (2016) show a wide gap from the benchmarks. Across 15 plants, including oil refineries, chemical plants and power stations, average alarm rates in normal operation ranged from 2 to 33 per 10 minutes, and peak rates during upsets from 72 to 625 per 10 minutes. In Japan, 15 of 29 chemical plants had monthly average rates per operator above the EEMUA benchmark. On one unit at Plant A over 31 days in March 2014, the rate per 10 minutes ranged from 19 to 342, with an average of 119 (Wang et al., 2016).

The overview names four main causes of alarm overload: chattering alarms that switch on and off because of noise, alarm variables configured incorrectly, alarms designed in isolation from related variables, and abnormalities that propagate through the physical connections between equipment (Wang et al., 2016). The fourth cause matters. According to Wang et al. (2016), floods are often not just nuisance alarms; many are correct alarms, because one initial abnormality triggers knock-on events in connected equipment.

At the LNG plant, rationalisation changes included revised priorities, corrected area assignments, changes to set points, ranges and deadbands, on and off delay timers, and logic modifications, all recorded through management of change. Alarms on one train fell from more than 10,000 a day to about 300 a day, and the storage and loading area also fell below 300 a day (Nugraha, 2019). The site's philosophy assigns priority from the operator's available response time and the severity of consequence, with frequency limits of fewer than 5 high-priority alarms per 8-hour shift, fewer than 2 medium-priority alarms per hour and fewer than 10 low-priority alarms per hour (Nugraha, 2019).

Reading the Numbers

A fall from more than 10,000 to about 300 is a reduction of at least 97%. By our calculation, 300 alarms a day is roughly 2 alarms per 10 minutes. In the IChemE Safety Centre (2021) table, about 2 per 10 minutes is rated sub-optimal, one step short of the target of about 1. So a very large improvement is still not the finish line, and Nugraha (2019) does list continued monitoring and an audit of the alarm philosophy as next steps. The report does not say whether the daily figures are per console or per operator, so this comparison is approximate.

The finding by Wang et al. (2016) on propagation also corrects a common belief. Removing nuisance alarms lowers the load in normal operation, but it may not prevent a flood during a major upset, because most of the alarms arriving together are valid. This is why IChemE Safety Centre (2021) separates stable-plant metrics (average rate, standing alarms) from unstable-plant metrics (peak rate and percentage of time in flood), and for the latter points to the enhanced and advanced alarm methods in ANSI/ISA-18.2-2016 (International Society of Automation [ISA], 2016).

Alarms in LOPA

In LOPA, an operator's response to an alarm can be credited as an independent protection layer (IPL) when it meets the criteria set out in the IPL guidelines (Center for Chemical Process Safety [CCPS], 2015). Bridges et al. (2026) summarise them: the alarm and the human response must be independent of other layers and of the initiating event, an alarm shown on the basic process control system is not independent when that control system is already credited as an IPL, the maximum allowable response time should be half or less of the process safety time, and the response must be trained and periodically validated. The usual credit for a human response is capped at a probability of failure on demand (PFD) of 0.1, meaning the correct response happens at least 9 times out of 10 (Bridges et al., 2026).

In our view, 9 out of 10 assumes the operator can see the right alarm, understand it and act within the time available. At 275 alarms in 11 minutes, or about 25 alarms a minute by our arithmetic, that assumption is hard to defend. In Swiss cheese terms, the holes in the alarm layer do not open on the day of the event; they form long before, through configuration, prioritisation and habits that are left alone.

The Texas City investigation shows another form of the same hole. On 23 March 2005, the high level alarm on the raffinate splitter tower activated at 3:09 a.m. and stayed in alarm throughout the incident, because operators routinely filled the tower above the transmitter's range during startup. The redundant high level alarm never sounded, its failure was not logged, and its set point was not known to operations staff. The explosion that followed killed 15 people and injured 180 (U.S. Chemical Safety and Hazard Investigation Board [CSB], 2007). We read this as a standing alarm that had become normal, so it no longer carried information when conditions turned dangerous.

Limits of the Evidence

Both studies have limits. Wang et al. (2016) draw their detailed example from one power plant, and some of the surveys they cite did not normalise alarm counts per operator, so plant-to-plant figures are not fully comparable. Nugraha (2019) is a practitioner report from a single site, with no comparison group and no safety outcome data before and after rationalisation. Alarm counts are an intermediate measure; neither study shows that accidents fell. We also found no public data on alarm performance at other Indonesian refineries, chemical plants or smelters, so we cannot say how common a figure above 10,000 alarms a day is.

The Indonesian Rules

Minister of Manpower Decree No. KEP.187/MEN/1999 on the Control of Hazardous Chemicals in the Workplace requires companies with a major hazard potential to report every change in process and modification of installations (Article 16(1)(d)), and to prepare a major hazard control document covering at least hazard identification, risk assessment and control, operation and maintenance of installations, worker development and safe work procedures (Article 19(1)) (Departemen Tenaga Kerja, 1999).

In oil and gas, Minister of Energy and Mineral Resources Regulation No. 32 of 2021 on Technical Inspection and Safety Examination of Installations and Equipment (Kementerian Energi dan Sumber Daya Mineral [ESDM], 2021) is implemented in part through Decree No. 199.K/HK.02/DMT/2024 of the Director of Oil and Gas Engineering and Environment. Its annex asks for technical data on instrumentation and process control systems and on safeguarding and emergency shutdown systems, management of change records, and verification of instrumentation installation (Direktorat Jenderal Minyak dan Gas Bumi [Ditjen Migas], 2024). We found neither the word alarm nor any alarm performance metric in that decree. Our reading is that the examination checks that systems exist and are installed correctly, while the quality of alarms as a protection layer is left to each company's own safety management system.

Rationalising the Alarms

The steps below draw on the guidance discussed above and can start without replacing the DCS.

  • Measure first. Export at least a month of alarm data and calculate alarms per 10 minutes per console, the peak per 10 minutes, percentage of time in flood, standing alarms and the ten most frequent alarms (HSE, 2000; IChemE Safety Centre, 2021).
  • Write the alarm philosophy. Set the alarm definition, prioritisation rules, roles and performance targets before changing any tag (ISA, 2016; IEC, 2022).
  • Start with bad actors. Where the priority distribution is far from roughly 80% low, 15% medium and 5% high, move on to full rationalisation (HSE, 2000; IChemE Safety Centre, 2021).
  • Base priority on consequence and available response time, as in the LNG plant's matrix (Nugraha, 2019).
  • Plan for floods. Because many upset alarms are valid alarms that propagate, plan advanced methods for unstable conditions, such as alarms that adapt to the operating state (IChemE Safety Centre, 2021; ISA, 2016; Wang et al., 2016).
  • Link alarms to LOPA. Flag every alarm credited as an IPL, check its independence and response time, train the response and record its validation (Bridges et al., 2026; CCPS, 2015).
  • Put every alarm change through management of change, and review standing alarms at shift handover (CSB, 2007; Nugraha, 2019).

The belief worth correcting is that more alarms mean more safety. The HSE (2000) guidance asks instead for a defined operator response to every alarm, and says process status indicators should not be designated as alarms.

Where Nusa Safety Fits

The Nusa Safety team can help refineries, chemical plants and other process facilities test whether the alarms credited as safeguards in their risk studies deserve that credit, through HAZOP and LOPA studies and a process safety management review. An alarm philosophy and alarm response procedures can be prepared with your instrumentation and operations teams through SOP and technical guideline development, and operators can rehearse abnormal situations on digital safety simulators.

Nusa Safety works as a third party, issues only internal training certificates, not competency certificates or OHS licences, and does not hold a PJK3 licence. Conversations can start through the contact page.

This article is general information and not legal or professional advice for any specific case.

References

  1. Bridges, W. G., Dowell, A. M., III, & Massello, M. (2026). Human response IPLs and human error prevention IPLs (beyond administrative controls) [Conference paper]. AIChE 2026 Spring Meeting and 22nd Global Congress on Process Safety, Houston, TX, United States. https://www.process-improvement-institute.com/wp-content/uploads/2026/04/Human-IPLs-and-HEP-IPLs-2026-R10-FINAL-1.pdf
  2. Center for Chemical Process Safety. (2015). Guidelines for initiating events and independent protection layers in layer of protection analysis. Wiley. https://doi.org/10.1002/9781118948743
  3. Departemen Tenaga Kerja. (1999). Keputusan Menteri Tenaga Kerja Nomor KEP.187/MEN/1999 tentang Pengendalian Bahan Kimia Berbahaya di Tempat Kerja [Minister of Manpower Decree on the control of hazardous chemicals in the workplace]. https://jdih.kemnaker.go.id/peraturan/detail/2608/keputusan-menteri-nomor-kep-187-men-1999
  4. Direktorat Jenderal Minyak dan Gas Bumi. (2024). Keputusan Direktur Teknik dan Lingkungan Minyak dan Gas Bumi selaku Kepala Inspeksi Minyak dan Gas Bumi Nomor 199.K/HK.02/DMT/2024 tentang Mekanisme Inspeksi Teknis dan Pemeriksaan Keselamatan [Decree on the mechanism for technical inspection and safety examination]. https://migas.esdm.go.id/cms/uploads/regulasi/2024/70401f238c9f3fa7f8158dc42741bc0e.pdf
  5. Engineering Equipment and Materials Users Association. (2024). Alarm systems: A guide to design, management and procurement (EEMUA Publication 191, 4th ed.). https://eemua.org/products/publications/print/eemua-publication-191
  6. Health and Safety Executive. (2000). Better alarm handling (HSE Information Sheet, Chemicals Sheet No. 6). https://www.hse.gov.uk/pubns/chis6.pdf
  7. IChemE Safety Centre. (2021). Lead process safety metrics: Alarm rationalisation (Guidance LC 0151_21). Institution of Chemical Engineers. https://www.icheme.org/media/17392/lc-0151_21-lead-process-safety-metrics-alarm-rationalisation-final.pdf
  8. International Electrotechnical Commission. (2022). IEC 62682:2022 Management of alarm systems for the process industries (Edition 2.0). https://webstore.iec.ch/publication/65543
  9. International Society of Automation. (2016). ANSI/ISA-18.2-2016 Management of alarm systems for the process industries. https://www.isa.org/products/ansi-isa-18-2-2016-management-of-alarm-systems-for
  10. Kementerian Energi dan Sumber Daya Mineral Republik Indonesia. (2021). Peraturan Menteri Energi dan Sumber Daya Mineral Nomor 32 Tahun 2021 tentang Inspeksi Teknis dan Pemeriksaan Keselamatan Instalasi dan Peralatan pada Kegiatan Usaha Minyak dan Gas Bumi [Minister of Energy and Mineral Resources Regulation on technical inspection and safety examination of oil and gas installations and equipment]. https://jdih.esdm.go.id/storage/document/Permen%20ESDM%20No.%2032%20Tahun%202021.pdf
  11. Nugraha, R. (2019). Pencapaian dan tantangan dalam penerapan Alarm Management System (AMS) di Badak LNG [Achievements and challenges in implementing an alarm management system at Badak LNG]. Jurnal Otomasi Kontrol dan Instrumentasi, 11(1), 25-36. https://doi.org/10.5614/joki.2019.11.1.3
  12. U.S. Chemical Safety and Hazard Investigation Board. (2007). Investigation report: Refinery explosion and fire, BP Texas City, Texas, March 23, 2005 (Report No. 2005-04-I-TX). https://www.csb.gov/assets/1/20/CSBFinalReportBP.pdf
  13. Wang, J., Yang, F., Chen, T., & Shah, S. L. (2016). An overview of industrial alarm systems: Main causes for alarm overloading, research status, and open problems. IEEE Transactions on Automation Science and Engineering, 13(2), 1045-1061. https://doi.org/10.1109/TASE.2015.2464234

TAKE THE NEXT STEP

Discuss This Topic With Us

CTA // READY WHEN YOU ARE

Raise the Safety Standard at Your Site.

The first consultation is free. Tell us what you are dealing with, and our team will map out the approach.